Home > Products > Flue Gas Desulfurization Systems > Water Film Flue Gas Desulfurization Equipment , Industrial Dust Collector
Water Film Flue Gas Desulfurization Equipment , Industrial Dust Collector
- 0 Piece / Pieces per Month
- T/T L/C D/P D/A
- 7 days
You May Like
-
97% Desulphurization Efficiency Smoke Scrubber Systems , Flue Gas Treatment System
-
Reinforced Polypropylene Material Vane Pack Mist Eliminator , Vane Mist Extractor For Industrial Smo
-
Polypropylene Vane Type Demister , Vane Mist Extractor With Liquid Sepearator Demister Pad
-
Irregular Pvc Mist Eliminator , Custome Cooling Tower Mist Eliminator
-
Custome Mist Eliminator Demister Polypropylene Material Low Resistance
-
150 Resistance PVC Material Mist Eliminator Demister For Wet Scrubber Equipment
Product Details
Brand Name | HAINA | Place of Origin | China | |
Model Number | XL |
Product Description
Certification:ISO9001 : 2008
Production Description
While the flue gas enters into the dust collector, alkaline water overflows from upper tower sink. It forms 5mm water film layer on the cylinder wall. The flue gas enters from bottom body with tangential velocity, which provides centrifugal force to make the gas rise and rotate along the wall inside the device. The flue gas gets in touch with water film of the cylinder body under the action of centrifugal force. While the dust is humidified by water film, sulfide reacts with alkaline droplets and flows into the circulation tank with the water from the bottom spillway hole. After purification, gas rises through the upper cylinder cone part and completes the purification process.
Preparation?before?Installation
1. Infrastructure, tank, trench should be completed and within the maintenance period before equipment is prepared to enter into site and be installed;
2. Prepare scaffold and crane well, if the equipment is less than 10t, light steel scaffold is suitable, if the equipment is more than 10t, steel pipe scaffold is suitable.
Installation Materials
1.Acid-proof mortar (yellow) ,glassy water(transparent liquid), furan powder(black), furan resin (black liquid), the above installation accessories will all be delivered from my company together with equipment.
2.Acid-proof cement: 25kg/bag, equipped with 1kg curing agent, mixing evenly after opening.
Installation and Precautions
1.When installing, equipment should refer to general assembly drawing from the bottom to the top sequentially, it can also be installed according to the number of each section. When installing the base of equipment, the base should be placed to the position horizontally, and then the bottom of the position should be covered 1-2cm furan resin daub, the orientations of the overflow hole and manholes should be paid attention to in particular.
2. When the base has been placed to the position, top flange washer should be covered 1-2cm thick furan resin daub from the second section, and then the uppers can be lift one by one.
3.Installation of equipment inlet: orientation of inlet should be determined in advance (ensure the consistency between inlet center of device and the boiler outlet duct center so as to connect with air duct conveniently)
4. Please follow the above steps to install successively. After finishing water tank section, please enter into the device with ladder or scaffold and clear excess cement of cyclone muff, seam between internal section and section should be filled.
5. Installation of annular water pipe: Please pay attention to the position of water feeding and aim the water inlet flange of coil straight at the position of pump water supply and then insert the hose to the ceramic sink. Water pipe and water sink should be sealed with acid-proof mortar (If equipment is equipped with venturi device, annular pipe flange should be on venturi side, so that it is advantageous for the connection between venturi and annular pipe)
6. After finishing the installation of tower, please make sure the seal of flange joints.