-
We are a contracting company specializing in industrial refrigeration projects requiring carbon steel pipes meeting ASTM standards including A106, A333, and A53. Our current requirement focuses on seamless pipes and fittings originating from Ukraine or European countries.
Please provide quotation for pipes compliant with specifications ASTM A106 (high-temperature service) and ASTM A333 (low-temperature service). The materials will be used in boiler systems and heat exchanger applications.
We require manufacturers with valid certification documents and capacity to handle bulk industrial orders. Kindly include material test certificates and production lead time details in your proposal.Saudi Arabia
Posted at: 2025-09-23 05:00:03M******Email:****** -
We require a galvanizing plant specifically for lighting poles production with kettle dimensions of 14.2x1.5x2.5m. The facility must operate on gas heating medium and include both open/closed acid vapor collection system options. Our project requires:
1. Semi-automatic production line (please clarify price difference vs fully automatic)
2. Integrated white zinc smoke enclosure and waste acid/water treatment systems
3. Flexible output capacity based on shift patterns
4. Custom plant design adaptable to available land area
Please provide technical specifications and layout proposals for equipment meeting these requirements.United Arab Emirates
Posted at: 2025-09-08 14:10:03H******Email:****** -
We are seeking 2 units of steam jacketed kettles with the following specifications:
- Capacity: 200/250 liters
- Heating method: Boiler
- Material: Stainless Steel 304
- Pressure: 150 psi
- Voltage: 220V (single phase)
- Form: Tilting type
- Special requirement: 1 unit requires paddle stirrer
Please provide:
1. Technical specifications sheet
2. Shipping dimensions and weight
3. Lead time and MOQ
4. FOB pricing
5. Compatibility with European standards
Samples required for evaluation before bulk order. Suppliers with CE certification preferred.Philippines
Posted at: 2025-08-26 10:50:03******Email:****** -
We require 2 pieces of stainless steel immersion heating elements with the following specifications:
- Power: 2500 W + 1000 W dual circuit
- Voltage: AC 220–240 V, 50/60 Hz
- Connection type: Screw-in immersion
- Capacity compatibility: 40L boiler
Urgent requirements:
1. Immediate stock availability in Xiamen area
2. Total price quotation for 2 units
3. Possible pickup arrangement within 24 hours
Please confirm specifications match our technical requirements and provide commercial details promptly.Philippines
Posted at: 2025-08-25 12:40:05T******Email:****** -
Seeking for Boiler Economizer. Model: 25S908 - 0, Working pressure: 3.3 Mpa, Test pressure: 4.95Mpa, Heating Surface: 1285m2, Sectional area of Gas Flowing: 2.2m2
India
Posted at: 2025-07-03 08:23:46******Email:****** -
A vacuum boiler, 1160 kw heating capacity, temp out/in 85/86 , heat exchanger SS is requested.
United Kingdom
Posted at: 2025-05-10 05:01:07******Email:****** -
We are looking for Waste Heat Recovery Boiler
India
Posted at: 2025-04-19 13:42:10******Email:****** -
looking for the availability of Double Tunnel Thermal Oil Single Board Drying Machine
Machine Type: Roller-type drying machine Capacity: 5m3/3m3 per batch Moisture Content: 1-55% Veneer Thickness: 1mm to 4mm (Eucalyptus) Heat Source: Thermal oil boiler (≥4 tons, self-provided) Dimensions: 40m (L) × 6m (W) × 4m (H) (38m insulation section)Ethiopia
Posted at: 2025-03-29 17:00:02******Email:****** -
Hi, we have a request for quotation of boiler heat exchanger
Vietnam
Posted at: 2025-01-14 09:10:02T******Email:****** -
we urgently need you to provide us an estimate FOB and CF price of a turnkey hyper-intensive (high density stocking around 500kg/m3), RAS Industrial Fish farm with fresh water RAS to grow out tilapia and catfish up to 1kg in 4 months. The plant will be located in Douala Cameroon in Central Africa Region, by the riverside with water available between 25 to 35°C. Specification as follow: Treatment Capacity: to be design Complete Tilapia line recirculating aquaculture system (RAS) with a capacity of 500 T/cycle and another Complete catfish line recirculating aquaculture system (RAS) with a capacity of 500 T/cycle normally containing Automatic feeding system and Design work. Furthermore, we will need your support and quotation for: a) General planning of the complete project. b) Detailed design of the fish pools including piping system and the workshops. c) Planning of the different recirculation systems according to the fish biology and production goal. d) Planning of incoming water and waste water treatment. e) Planning of the total energy supply (electricity, air/oxygen, cooling/heating) equipment supply. f) Assembling of the RAS, test run and training of the staff for RAS running, training of the farm’s staff and professional start of the operationalization of the project. g) During the initial operation and later on, we need your know-how and experience (Maybe to hire a Chinese operation director for a year).
South Africa
Posted at: 2024-11-11 04:20:49******Email:****** -
Inquiry About Automatically electric heating steam boiler with best price
India
Posted at: 2024-09-26 14:26:34******Email:****** -
Our company requires 230V/50HZ AC centrifugal fans capable of providing the following average performance values from 120 m3/h to 340 m3/h for the serial production of devices designed to remove hot flue gases during the operation of floor-mounted gas heating boilers.
Poland
Posted at: 2024-09-03 16:55:30******Email:****** -
Seamless Boiler Tubes or Heat Exchange Tubes - 2000 units Thickness: 5.588mm OD: 50.80mm Lenght: 12meters ASTM A-192
Argentina
Posted at: 2024-08-13 05:29:39A******Email:****** -
I am looking for price on a 50 Tons per hour 3-stage Waste Heat Evaporation plant
South Africa
Posted at: 2024-07-04 18:29:03D******Email:****** -
we need: Teflon shoe, sp-420 - 70 pcs. stb-200 - 35 pcs. knife 3100512 \"Yamato\" - 5 pcs. knife 3100513 - 5 pcs. knife 350218 - 5 pcs. knife 350220 - 5 pcs. knives 202295 - 30pcs. steam trap 001 for steam iron - 4 pcs. BSP-300 full steam iron - 4 pcs. Heating tube 9KW 150 for boiler parts - 2 pcs. 6 PCs sharpeners for Oshima. 20-PCs needle plate for Tajima embroidery machine. Heating tube 9kW 150 for boiler parts - 2 pcs. 143169 Needle plate-20PCs.
Russian Federation
Posted at: 2024-06-17 21:26:41C******Email:****** -
How much would a twin Expander with Generator for Power Generation from a 3 TPH F&A 100 Deg C Boiler Steam. What is Out put in KWH.
India
Posted at: 2024-03-12 13:58:55S******Email:****** -
please can i get a qoute for heat boiler send to email above
Global
Posted at: 2023-12-10 21:20:02A******Email:******