Home > Buyer Service > pool equipment
- Inquiries by Catalogs
- Security & Protection
- Office Supplies
- Packaging & Printing
- Electrical & Electronics
- Textile
- Service
- Apparel & Accessories
- Industrial Equipment & Components
- Arts & Crafts
- Chemicals
- Computer Products
- Furniture
- Construction & Decoration
- Transportation
- Agriculture & Food
- Auto, Motorcycle Parts & Accessories
- Light Industry & Daily Use
- Toys
- Tools & Hardware
- Bags, Cases & Boxes
- Consumer Electronics
- Metallurgy, Mineral & Energy
- Health & Medicine
- Instruments & Meters
- Sporting Goods & Recreation
- Lights & Lighting
- Manufacturing & Processing Machinery
6 inquiries about pool equipment
We need swimming pool equipment
- India
- IP : 157.45.227.**
- 2025-06-06 07:10:05
hi looking for swimming pool equipments
- IP : 103.184.87.**
- 2024-12-02 18:30:02
we urgently need you to provide us an estimate FOB and CF price of a turnkey hyper-intensive (high density stocking around 500kg/m3), RAS Industrial Fish farm with fresh water RAS to grow out tilapia and catfish up to 1kg in 4 months. The plant will be located in Douala Cameroon in Central Africa Region, by the riverside with water available between 25 to 35°C. Specification as follow: Treatment Capacity: to be design Complete Tilapia line recirculating aquaculture system (RAS) with a capacity of 500 T/cycle and another Complete catfish line recirculating aquaculture system (RAS) with a capacity of 500 T/cycle normally containing Automatic feeding system and Design work. Furthermore, we will need your support and quotation for: a) General planning of the complete project. b) Detailed design of the fish pools including piping system and the workshops. c) Planning of the different recirculation systems according to the fish biology and production goal. d) Planning of incoming water and waste water treatment. e) Planning of the total energy supply (electricity, air/oxygen, cooling/heating) equipment supply. f) Assembling of the RAS, test run and training of the staff for RAS running, training of the farm’s staff and professional start of the operationalization of the project. g) During the initial operation and later on, we need your know-how and experience (Maybe to hire a Chinese operation director for a year).
- South Africa
- IP : 102.132.24.**
- 2024-11-11 04:20:49
Dear,sir/ madam pls send me details of wave pool equipment list.thank you
- China
- IP : 103.205.134.**
- 2024-10-09 01:19:12
Inquiry About Wholesale Waterpark equipment surf simulator flowrider with Wave pool machine
- China
- IP : 14.1.65.**
- 2024-09-18 20:43:34
Please select a two-section fan cooling tower. The power of one section is 1276 kW. Water temperature at the entrance to the cooling tower is 30 C Water temperature at the outlet of the cooling tower is 25 C Outdoor air temperature according to wet thermometer 22 C The presence of a heated pan to prevent freezing. The design of the cooling tower must ensure operation in the mode: one section is working, the other is reserve and vice versa. The design of the cooling tower must ensure the ability of one section to operate completely with the shut-off valves drained off and drained from the reserve section SOW pipelines. The pool of sections must be separated by a partition so that one of the sections can be completely drained. Return water parameters: - pH - 8.64; - total hardness - 5.52 mEq/l; - concentration of petroleum products -0.39 mg/dm3; - chloride ion concentration - 22.0 mg/dm3; - concentration of suspended substances - 12.7 mg/dm3; The service life of all elements of the cooling tower, with the exception of the load-bearing frame, pan (bowl), pipelines, fan and enclosing structures, is at least 10 years. The service life of the load-bearing frame, tray (bowl), pipelines, fan and enclosing structures is at least 15 years. The equipment must be equipped with drives based on brushless (non-contact) or asynchronous motors.
- Belarus
- IP : 178.127.8.**
- 2024-07-15 20:01:03