-
I need to purchase SGX28HP 12 Port BT PD Load Board for PCB assembly requirements.
Current required quantity is 1 unit.
Please provide specifications and availability details.India
Posted at: 2025-09-29 15:10:06S******Email:****** -
We require small coils for pick-and-place PCB assembly with the following specifications:
- OD 2.7mm
- ID 0.7mm
- Height 1.05mm
- Approximately 300 turns
- 0.04mm wire diameter
- SMT pads for automated soldering
Annual purchase quantity is 1 million units. Samples are required for evaluation before bulk order. Manufacturer must provide engineering review of specifications and design documentation. Production capability must include SMT-compatible packaging.New Zealand
Posted at: 2025-09-17 11:50:32******Email:****** -
We require full turnkey manufacturing services for automotive-grade IoT safety devices. The product must be capable of safety-critical threat detection within vehicle environments.
Key requirements:
- ESP32-S3 chipset with machine learning inference capabilities
- Integrated Quectel BG77 LTE-M cellular connectivity
- GPS tracking functionality
- Operational temperature range of -30°C to 85°C
- High reliability automotive certification
Manufacturing services needed:
1. PCB fabrication
2. Component procurement and assembly
3. Firmware programming
4. Basic functional testing
Please provide quotations for production quantities of 50, 100, 500, and 1000 units.}South Africa
Posted at: 2025-09-09 22:20:03******Email:****** -
We seek a reliable manufacturer for PCB assembly tooling including wave/selective soldering masks, reflow carriers, and panel depanelization fixtures. Our requirements include:
1. Full design capability based on provided PCB data and specifications
2. Production files delivery in PDF/STEP formats post-approval
3. Quality inspection reports with dimensional verification
4. Fast-response quoting within 24 hours
5. DHL/FedEx express shipping to Germany
The supplier must demonstrate cost-effective manufacturing solutions while maintaining German quality standards. Initial project requires quick turnaround with potential for ongoing collaboration.Germany
Posted at: 2025-09-07 19:50:05******Email:******