Mountain Electric Cycle

Browse 8 global buying requests and sourcing opportunities.
  • Require gold centrifugal concentrator with below specifications:  
    1. Processing capacity: 0.5-0.6 t/h for feed ≤3mm (optimal 0.074-2mm)  
    2. Electrical versions: 220V single-phase and/or 380V three-phase  
    3. Customized diesel engine version with cost difference  
    4. Minimum 95% fine gold recovery rate  
    5. Water consumption: 2-3 m3/h  
    6. Manual operation with 1-4 hour cleaning cycle  
    7. Must include: Bowl with replaceable rubber liners, carbon steel casing, basic spare parts kit, operation manual  
    8. FOB China port delivery  
    9. Initial order quantity: 1 unit (potential repeat orders)  
    10. Final destination: Callao Port, Peru

    Peru Peru
    Posted at: 2025-08-30 05:30:05
    ******
  • Looking for compliant mountain electric bicycles adhering to UK regulations. Interested in models with:
    - 250W motor power
    - Lithium-ion battery system
    - Lightweight frame design
    - Mid-drive configuration
    Please provide product specifications, minimum order quantity, pricing details, and estimated delivery timeline for modern electric bicycles meeting current legal requirements.

    United Kingdom United Kingdom
    Posted at: 2025-08-21 17:20:05
    ******
  • Hello, please send us your best offer for a HOSPITAL WASTE INCINERATOR conforming to these technical specifications Features Complete combustion at temperatures above 1000 °C Safe destruction of all pathogens Incineration rate of 5 to 20 kg of waste per hour, low fuel consumption Flame retardant lining for temperatures up to 1250 °C Modular design for easy on-site transport and assembly Incinerates up to 8 cubic feet (.22 cubic meters) per load, 330lbs (150kg) per day Ready to use upon delivery Minimal training Easy to operate with state-of-the-art controls Automatic, pre-set cycle control for startup and shutdown Dual chamber combustion and high exhaust temperatures in excess of 1000°C Thermostatic temperature control for efficient fuel consumption On board 40-gallon fuel tank Manufactured in ISO 9001:2008 certified facility Temperature measurement while cycling. Capacity: 10-15 of waste per hour Weight: 907Kg (approximately 2000lbs) External Dimensions: WxDxH= 730x 900x1300mm Size main chamber: WxDxH=430x330x700mm Chimney Height: approx. 6 m above incinerator Temperature resistance of lining: 1250°C Electrical: 230v 50Hz Fuel: Diesel 10-20 KW, 2-3l/h After sales service: Yes, installation and start-up. Present a catalog: Yes, Request Warranty: 3 years Transport: Transportable by air on standard EURO pallet As well as its transport costs from your home to the port of Lomé in Togo

    Niger Niger
    Posted at: 2025-06-20 18:36:08
    ******
  • I’d like to order one piece of this bike to Switzerland. What’s the bike's price? I'd like to buy the ebike CE SGS EN15194

    Guatemala Guatemala
    Posted at: 2025-06-17 03:00:02
    M
    ******
  • Please send me more about the product price.

    Global Global
    Posted at: 2025-05-18 13:31:05
    ******
  • I am interested in your products like kids bicycles/ Tricycles,mountain cycles

    China China
    Posted at: 2025-03-22 00:40:03
    ******
  • we urgently need you to provide us an estimate FOB and CF price of a turnkey hyper-intensive (high density stocking around 500kg/m3), RAS Industrial Fish farm with fresh water RAS to grow out tilapia and catfish up to 1kg in 4 months. The plant will be located in Douala Cameroon in Central Africa Region, by the riverside with water available between 25 to 35°C. Specification as follow: Treatment Capacity:  to be design Complete Tilapia line recirculating aquaculture system (RAS) with a capacity of 500 T/cycle and another Complete catfish line recirculating aquaculture system (RAS) with a capacity of 500 T/cycle normally containing Automatic feeding system and Design work. Furthermore, we will need your support and quotation for: a)     General planning of the complete project. b)    Detailed design of the fish pools including piping system  and the workshops. c)     Planning of the different recirculation systems according to the fish biology and production goal. d)    Planning of incoming water and waste water treatment. e)      Planning of the total energy supply (electricity, air/oxygen, cooling/heating) equipment supply. f)     Assembling of the RAS, test run and training of the staff for RAS running, training of the farm’s staff and professional start of the operationalization of the project. g)     During the initial operation and later on, we need your know-how and experience (Maybe to hire a Chinese operation director for a year). 

    South Africa South Africa
    Posted at: 2024-11-11 04:20:49
    ******
  •  would like to consult the product infor and pricing of Electric Mountain bike.

    China China
    Posted at: 2024-10-31 16:19:05
    ******