-
We require a complete production line for bio-based PU leather manufacturing. The system must include mixing/casting/coating units, lamination equipment, drying/curing oven, calendering machine, embossing system, finishing/coating section, unwind/rewind mechanisms, and in-line quality control.
Key specifications:
- 2.0m working width (± few cm)
- Minimum 500m2 daily output (8-hour shift basis)
- Compatible with 0.9-1.2mm thickness production
- Processes must support solvent-free/low-solvent PU applications
- Capable of handling recycled polyester/poly-cotton substrates
- Required finishes: pigment coloring, matte/satin effects, optional grain patterns
- Full technical specifications needed for utilities consumption (power, compressed air, cooling)
- Mandatory closed-loop thickness control and precise oven temperature zoning
- CE safety certification required
Please provide detailed technical proposals with equipment specifications.
Ethiopia
Posted at: 2025-10-28 13:10:02S******Email:****** -
We require a pump pressure test system capable of handling maximum pressure of 725psi (50 bars) with 1/2" NPT pressure hose connection. The unit should have 3.6 gallons tank capacity and operate within maximum temperature of 50°C (120°F). Required specifications include piston volume of 2.3 cubic inches, dimensions 28"x8.5"x9.5", and weight under 14lbs. Please provide RIGID Model 50557 (Catalogue 1450). Looking to purchase 2 units for leak detection in heating, potable water, fire sprinkler, compressed air, small bore pipe lines, and oil systems.
Zambia
Posted at: 2025-09-20 23:41:11
******Email:****** -
We require air handling units with G4, F7, and H13 filters in series configuration.
Two units needed:
1. 14,000 m3/h airflow capacity
2. 21,000 m3/h airflow capacity
Chilled water units required with capacities:
1. 90 kW cooling capacity
2. 105 kW cooling capacity
Potential substitution of chilled water units with condensing units is acceptable.
All equipment must meet specified technical parameters.
Algeria
Posted at: 2025-09-20 20:10:27
******Email:****** -
We require two air handling units with specific configurations:
1. First unit: 14000 m3/h airflow capacity with G4, F7 and H13 filters in series
2. Second unit: 21000 m3/h airflow capacity with same filter configuration
Simultaneously need two chilled water units:
1. First unit: 90 kW cooling capacity
2. Second unit: 105 kW cooling capacity
Potential consideration for condensation units as alternative to chilled water units. Please provide technical specifications and compliance certifications for all components.
Algeria
Posted at: 2025-09-17 23:40:02
******Email:****** -
Inquiry About AAHF --- Air-handling unit with aluminium peata post
China
Posted at: 2024-10-18 12:35:03
******Email:******