4 inquiries about h 06 ptnc

We require annual supply of specific components:  
- TH-HY2B: 410,250 units  
- C-06-4TNC: 82,050 units  
- H-06-PTNC: 82,050 units  

Please confirm manufacturing capability for these exact product codes and quantities.  
Provide specifications confirmation and production lead time details.

France
IP : 77.245.136.**
2025-09-17 21:48:37
Contact Info

We require annual procurement of 100,000 units per year for each of the following SWB components: 2022TH-HY2B, 2022-06-4TNC, and 2022H-06-PTNC. These parts will be used in a HELLA DAIMLER project at our manufacturing plant in Tunisia.  

 
The production start date (SOP) is scheduled for mid-2027. All components must meet Daimler standard specifications.  

 
Please provide technical compatibility confirmation and manufacturing capability details. No contact information should be included in the response.

France
IP : 37.66.2.**
2025-09-03 18:00:05
Contact Info

We are currently sourcing structural plastic timber for an upcoming project and need a quotation for the following items: Dimensions (W x H x L) and Quantity: 136.6 mm x 285.75 mm x 3505.2 mm, 244 pcs; 136.6 mm x 285.75 mm x 1676.4 mm, 122 pcs; 136.6 mm x 285.75 mm x 2616.2 mm, 350 pcs. Response should include: Availability and lead time; Unit pricing and total cost; Material specifications and compliance with UFGS 06 10 00; Shipping terms and options to Singapore; Any minimum order requirements or custom tooling fees. Will provide additional technical details or drawings if needed.

Norway
IP : 81.167.254.**
2025-06-05 22:00:03
Contact Info
to page go