-
well pumpDear sirs, We are copper recycling end refining company in Morocco. We want to purchase an electrical furnace for semi contiuous casting of copper billets diameter 90mm casting of 3 strands We need your model GYT 300
Morocco
Posted at: 2024-03-26 15:33:22A******Email:****** -
1 X ELECTRIC MOTOR YE2-90L-4; 1.5kW, 380V, 3.7A, 1400 rpm
Zimbabwe
Posted at: 2024-02-21 18:00:16P******Email:****** -
Hello! Any chance i can reach you by whatsapp? Need two machines 1 Multi-wire Drawing machine with annealing (4 wires) Used for drawing copper wire from dia 4*1.2 to 4*0.2-0.5 mm for wire and cable manufacturers and take up on one bobbin Production efficiency 4*0.4 mm = 6 m/s 2 Upcasting machine The line is used to produce high conductivity oxygen free copper rod 8-20mm. Melting furnace adopts one set 500kg/120kw electric furnace, and the holding furnace adopts one set 80 kwelectric furnace. Annual output of two connected updraft continuous casting unit is 3000 tons/year.
Russian Federation
Posted at: 2023-12-28 21:13:54******Email:****** -
Dear Sir/Madam, My name is Sakkas Dimitris. We are looking for a complete production line for wood pellets from pine, fir and elm trees. The production line capacity should be around 3,5 tones/hour and the line should be up and running for 8000h/year. The production line should consist of: -Wood chipper 12 t/h -Wood chips cleaner 12t/h (separation from dust, mud etc) -Furnace (15MW thermal power) using solid state fuels ie. wood chips, charcoal etc. -Dryer with chip conveyor (input) and all the components required for air transportation of dried chipps to pellet mills (output) -Wood chip mill 3,5t/h -Pellet mills (ring die) for 3,5t/h (including peripherals, compression 25mm) -Pellet Cooling system -2x Packing system for 15 (plastic bags) and 40kg (cotton bags) This production plant should include all electrical connections, automation systems and all the peripherals like cyclones, filters, conveyors, furnace fuel feed supply system and ash removal system. We are looking forward to an initial offer from your side. The offer should include the transportation of the plant to our facilities in Karditsa, Greece and the proper installation. Thank you very much in advance for your cooperation.
Russian Federation
Posted at: 2023-12-27 23:22:45******Email:******