Home > Products > high-strength non-shrink grouting material c40, c60 grouting material, bearing mortar, epoxy grouting material, manufacturer
high-strength non-shrink grouting material c40, c60 grouting material, bearing mortar, epoxy grouting material, manufacturer
You May Like
-
ground空鼓裂縫維修材料 ground hollow and crack repair materials 萬吉環(huán)氧灌漿樹脂膠 wanjie epoxy grouting resin adhesive 廠家 manufacturer
-
gansu, cement pavement repair material, quick-hardening emergency repair material, polymer mortar, manufacturer
-
concrete hollow repair glue, ceramic tile hollow repair glue, floor hollow repair method
-
concrete road rapid repair material, bridge pavement expansion joint repair material, quick traffic resumption, pavement restoration, pavement damage emergency repair material
-
guizhou guiyang modified epoxy resin steel bonding adhesive. what is the function of the steel bonding adhesive?
-
guizhou, increase the adhesive force of concrete, 302 epoxy interface agent, manufacturer
Product Details
Product Characteristics | Early Strength | Place of Origin | Beijing | |
Brand | Wanji | Function | Reinforcement | |
Specification | 40 | Material | Cement-Based | |
Application Range | Secondary Grouting of Equipment, Column Reinforcement |
Product Description
Pre-construction Preparation
1. Machine mixing: Concrete mixer or mortar mixer; 2. Manual mixing: Several mixing troughs and shovels;
3. Several buckets; 4. Several platform scales;
5. Flow channel; 6. High-level funnel, grouting pipe and pipe joints;
7. Grouting booster; 8. Templates (steel formwork, wooden formwork);
9. Straw bags, rock wool quilts, etc.; 10. Cotton yarn, adhesive tape;
Grouting Construction
: Foundation treatment The foundation surface should be roughened. Clean the foundation surface, and there should be no debris such as crushed stones, floating slurry, floating ash, oil stains and release agents. 24 hours before grouting, the foundation surface should be fully moistened, and 1 hour before grouting, the accumulated water should be removed.
: Formwork erection 1. Set up the formwork according to the grouting construction drawing. Seal the joints between the formwork and the foundation, and between the formworks with cement slurry and adhesive tape to achieve the degree that the overall formwork does not leak. 2. The horizontal distance between the formwork and the equipment base should be controlled at about 100mm to facilitate the grouting construction. 3. The top elevation of the formwork should be 50mm higher than the upper surface of the equipment base. 4. If the grouting slurry runs out during grouting, it should be dealt with in time.
Third step: Preparation of grouting material 1. Generally, it is mixed with water according to the standard of 12% for the general reinforcement type, that is, 25 kilograms of a bag of grouting material is mixed with 3 kilograms of water. 2. Use mechanical mixing, and the mixing time is generally 1 - 2 minutes (it is strictly prohibited to use an electric hand drill mixer).
When using manual mixing, 2/3 of the water should be added and mixed for 2 minutes first, and then the remaining water should be added and mixed until it is uniform. 3. The amount of each mixing should depend on the amount of use, and the material should be used up within 40 minutes. 4. When used on site, it is strictly prohibited to mix any additives and admixtures into the CGM grouting material. 5. The reference dosage is: 2280 - 2400kg/m3
Fourth step: Grouting construction method 1. For longer equipment or track foundations, segmented construction should be adopted. 2. Several commonly used grouting methods are illustrated (next page)
3. When performing secondary grouting, the following requirements should be met. During secondary grouting, grouting should be carried out from one side or adjacent two sides at multiple points until it overflows from the other side to facilitate the exhaust during the grouting process. It is not allowed to perform grouting from four sides simultaneously., After the grouting starts, it needs to be carried out continuously without interruption. And the grouting time should be shortened as much as possible., During the grouting process, it is strictly prohibited to vibrate. If necessary, the grouting booster can be used to push the CGM grouting material along the bottom of the grouting layer. It is strictly prohibited to push from the middle and upper part of the grouting layer to ensure the homogeneity of the grouting layer., After the equipment foundation grouting is completed, a 45-degree bevel should be cut along the edge of the equipment 3 - 6 hours after grouting to prevent cracks at the free end. If the edge cutting treatment cannot be carried out, the surface of the grouting layer should be polished with a trowel 3 - 6 hours after grouting., When the thickness of the grouting layer exceeds 150mm, the high-strength non-shrinkage grouting material of the bean stone reinforcement type should be used., When the grouting amount of the equipment foundation is large, the mixing of the bean stone reinforcement type grouting material should be carried out by mechanical mixing to *** grouting construction.
Contact Us
- Beijing Wanjijianye Building Materials Co., Ltd.
- Contact nameZhang Tao Chat Now
Product Categories
New Products
-
shandong epoxy resin steel bonding adhesive, epoxy resin pouring steel bonding adhesive, strong impact resistance, high strength, aging resistance
-
tianjin baogang reinforcement grouting adhesive, steel bonding reinforcement adhesive, concrete structure steel reinforcement adhesive, high strength
-
datong modified epoxy resin steel bonding adhesive, pouring steel bonding adhesive, high strength, aging resistance, corrosion resistance
-
taiyuan, two-component epoxy mortar, water-emulsion epoxy resin mortar, repairing mortar, manufacturer
-
high-strength polymer repair mortar. concrete surface damage, honeycomb and pitted surface repair and reinforcement, defect repair. strong adhesive force.
-
epoxy repair mortar manufacturer, epoxy resin mortar, epoxy mortar, epoxy cement anti-corrosion and aging resistance
-
high-strength non-shrink grouting material, c60 grouting material manufacturer, road and bridge engineering reinforcement, anchor bolt grouting, secondary grouting
-
tianjin cement road surface repair material road damaged potholes and peeling emergency repair material manufacturer
-
tianjin dongli polymer anti-corrosion mortar, polymer mortar for anti-corrosion and reinforcement of sewage ponds, manufacturer
-
baoding, concrete anti-dusting agent, cement wall and floor surface dusting repair material, manufacturer
-
jingzhou shashi concrete hollow drum crack repair glue, good bonding effect, manufacturer
-
epoxy resin mortar (epoxy mortar) in shunyi district, beijing, epoxy grouting material, manufacturer
-
cangzhou, prestressed duct grouting material for bridges, grouting agent for bellows, manufacturer
-
beijing, prestressed duct grouting material for bridge, grouting agent for bellows, manufacturer
-
polymer reinforced mortar wanjii company
-
c80 high-strength non-shrinkage grouting material, engineering reinforcement grouting material, self-compacting mortar, construction available in winter
-
concrete color difference repair agent, adjust concrete color difference, beam tunnel, good durability, technical guidance
-
defect repair of concrete honeycomb and holes - polymer repair mortar manufacturer
-
two-component polymer repair mortar, waterproof and anti-corrosion mortar, acid and alkali resistant and anti-corrosive, for repairing sewage tanks
-
tianjin, coated steel bonding adhesive, structural adhesive line for bridge dynamic load reinforcement, steel bonding adhesive for beams and slabs, manufacturer
-
injection bonding steel glue, pouring bonding steel plate, reinforcement glue grade 1 two-component structural steel plate adhesive, manufacturer
-
beijing epoxy resin steel bonding adhesive manufacturer - epoxy resin steel bonding adhesive supplier
-
hunan, high-strength polymer mortar, concrete defect reinforcement, cement pavement with exposed reinforcement, surface abrasion, honeycomb filling and reinforcement
-
beijing, grade 1 c55 polymer mortar, honeycomb, pitted surface, exposed reinforcement, old and dilapidated, concrete repair and reinforcement
Popular Searches
Recommended Products
- Stabilized 2.25" Diameter TP347H Stainless Steel Pipe 0.18" Wall Thickness Stainless Steel Tube
- Precipitation Hardening 1.75" Diameter 17-4PH Stainless Steel Pipe 0.11" Wall Thickness Stainless Steel Tube
- Super Austenitic 12" Diameter 904L Stainless Steel Tube 1.1" Wall Thickness Stainless Steel Pipe
- 0.5" Diameter Hardened 410 Stainless Steel Tube 0.05" Wall Thickness Stainless Steel Pipe
- 5.Acid Resistant 5.5" Diameter 316Ti Stainless Steel Pipe 0.45" Wall Thickness Stainless Steel Tube
- High Temp 10" Diameter 321H Stainless Steel Tube 0.9" Wall Thickness Stainless Steel Pipe
- Heat Resistant 4.5" Diameter 309S Stainless Steel Pipe 0.4" Wall Thickness Stainless Steel Tube
- 8" Diameter High Corrosion 317L Stainless Steel Tube 0.7" Wall Thickness Stainless Steel Pipe
- High Strength 3.5" Diameter 2205 Duplex Stainless Steel Tube 0.35" Wall Thickness Stainless Steel Pipe
- Automotive Grade 7" Diameter 409 Stainless Steel Pipe 0.6" Wall Thickness Stainless Steel Tube
- 2.5" Diameter Chemical Resistant 316L Stainless Steel Tube 0.15" Wall Thickness Stainless Steel Pipe
- Low Carbon 5" Diameter 304L Stainless Steel Pipe 0.25" Wall Thickness Stainless Steel Tube
Find Similar Products By Category
- Metallurgy, Mineral & Energy > Steel & Products > Steel Pipe & Tube
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Zhang Tao
Hi there! Welcome to my shop. Let me know if you have any questions.
Your message has exceeded the limit.

- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile