5AP920.1505-01
- 152 Piece / Pieces per Month
- T/T
- 1 days
You May Like
Product Details
Brand Name | B&R | Place of Origin | China | |
Model Number | 5AP920.1505-01 |
Product Description
Brand:B&R
Type:5AP920.1505-01
Origin:the United States
Warranty: 365 days
Colour: new/used
Shipping method: Courier delivery
Products are widely used in metallurgy, petroleum, glass, aluminum manufacturing, petrochemical industry, coal mine, papermaking, printing, textile printing and dyeing, mechanical, electronic manufacturing, automobile manufacturing, plastic machinery, electric power, water conservancy, water treatment/environmental protection, boiler heating, energy, power transmission and distribution and so on.
Spare parts spare parts, the main DCS control system of PLC system and the robot system spare parts,
Brand advantage: Allen Bradley, BentlyNevada, ABB, Emerson Ovation, Honeywell DCS, Rockwell ICS Triplex, FOXBORO, Schneider PLC, GE Fanuc, Motorola, HIMA, TRICONEX, Prosoft etc. Various kinds of imported industrial parts
construction drawings for construction/installation of the work specified herein, you agree to comply with the requirements of City of San Diego for special inspections, structural observations, construction material testing and off-site fabrication of building components, contained in the statement of special inspections and, as required by the California construction codes. b. NOTICE TO THE CONTRACTOR/BUILDER/INSTALLER/SUB-CONTRACTOR/OWNER-BUILDER: By using this permitted construction drawings for construction/installation of the work specified herein, you acknowledge and are aware of, the requirements contained in the statement of special inspections. You agree to comply with the requirements of City of San Diego for special inspections, structural observations, construction material testing and off-site fabrication of building components, contained in the statement of special inspections and, as required by the California construction codes. c. The special inspector must be registered by the City of San Diego Development Services Department, in the category of work required to have special inspection. d. The special inspections identified on plans are, in addition to, and not a substitute for, those inspections required to be performed by a City's building inspector. II. Additional Regulations A. Very High Fire Hazard Severity Zone (VHFHSZ) When the addition and or alteration to an existing building is in a VHFHSZ and the building permit application for the existing building was deemed complete on or after 8/27/2009, the material and method of construction used for the addition and remodel shall comply with the requirements specified in CRC, Section R337, as amended by San Diego Municipal Code (SDMC) Section 55.9401. B. Brush Management Zone When the addition is encroaching or located within Brush Management Zones, it shall comply with the City of San Diego’s Landscape Regulations, SDMC Section 142.0412. C. Storm Water Requirements & Best Management Practices (BMP’s) The project shall comply with all requirements of the State MS4 permit; California Regional Water Quality Control Board (San Diego), the City of San Diego Land Development Code, and the City’s Storm Water Standards Manual. 1. Construction BMP general notes: BMP notes are required on every plan set with a proposed ground disturbance of less than 1,000 square feet.
The current notes may be found in the City’s Storm Water Standards Manual, Part 2, Appendix E. 2. Water pollution control plan (WPCP) requirements: a. A WPCP is required for any project which has a ground disturbance that equals or exceeds 1,000 square feet but is less than 1 acre. A separate plan sheet must be included in the plan set which correlates to the WPCP. b. A Minor Water Pollution Control Plan (MWPCP), Form DS-570, may be utilized in lieu of a full WPCP for projects that create a ground disturbance of between 1,000 and 4,999 square feet and have less than a 5-foot elevation differential over the project area. If the project qualifies for an MWPCP, please fill out Form DS-570 and scan into the plan set along with Form DS-560. D. Energy Requirements 1. Additions or Alterations All single dwelling units and duplex additions or alterations must comply with the California Energy Code (CEC), Title 24, Part 6. Several compliance methods are described in the Residential Manual and are available in the California Energy Commission website or call 1-800-772-3300. 2. Minimum Acceptable Requirements See Table 9 for the minimum acceptable requirements for the simplest method. In addition to the Mandatory Measures summary (MF-1R form) mentioned in Section IV C of CEC, you may complete the
Contact Us
- Temporal Ming sheng automation equipment co., LTD
Product Categories
New Products
Popular Searches
- Communication Module
- plc splitter
- Card Splitter
- splitter module
- touch screen
- robot arm
- mini pc
- bldc motor
- touch panel
- touch monitor
- frequency inverter
- signal isolator
- Industrial Robot
- Brushed Dc Motor
- automation equipment
- Laminated Glass Autoclave
- automation control
- Signal Converter
- planetary reducer
- Welding Robot
- Palletizing Robot
- pc touch
- touch sensor
- gps touch
- hmi
- industrial control
- Roller Track
- signal transmitter
- Assembly Part
Recommended Products
Find Similar Products By Category
- Electrical & Electronics > Power Transmission & Transformer > Transformer

Product Tags:
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
sales
Welcome to my shop, I'm glad to serve you. Please feel free to send me any questions you may have.
Your message has exceeded the limit.
- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile