Hot runner, Cold runner, Pin-point gate, Submarine gate, etc
Design software
UG, CAD, PROE, SOLIDWORKS,CAXA, etc.
Plastic material
PP, PC, PS, PE, PU, PVC, ABS, RUBBER,SILICON, etc
Mould life
300,000-3,000,000 shots
Delivery time
15-60 days
Payment Terms:
T/T or L/C
Packaging
Wooden Cases
Transportation
By Sea or by air
Export Country
worldwide
Specification
Depends on customer's requirements.
OEM order
welcome
Packaging & Shipping
Packaging details:
Step 1, the mould covered with anti-corrosive oil inside.
Step 2, mould outside paint with anti-rust oil and plastic film outside.
Or painting some special colors like blue color, yellow color, etc, and plastic film outside.
Step 3, final packed into wooden case.
Our Services
Car Front Bumper injection plastic mould mold for the manufacture of kayak
1.Mould Material Q/C
a) mould steel checking (hardness,flaw detection)
b) mould spare parts checking (hardness,size)
2.Mould Making Process Q/C
a) design checking ( part design,mould desig,mould enginering drawing)
b) mould size checking (according to drawing)
c) mould testing (check mould working,sample)
Our Advantage
1. We are manufacturer
2. Competitive price
3. High mould quality with guaranteed
4. On time delivery
5. Strict quality control
6. All the mould produced follow on customers’ requirements
Offer you
Professional & detailed response
In time complete quotation
Professional and integrity designs & drawings
Once a week mould process machining
In-time mould test and sample delivery
For more information please contact us.
Company Information
Taizhou Huangyan Chenhang Mould Factoryis a professional company engaged in mould design, manufacturing & producing, we are specialized in commodity mould (such as bucket, chair, turnover box and desk) and other injection mould. Our factory is located in Taizhou Huangyan where is a beautiful and nationally renowned "Mould town of China"
** We can tailor various kinds of moulds according to customers’ requests. And our quotation can be made both based on drawings and customers’ products details. We also accept sample order. We are manufacturer, so our moulds are both excellent in quality and reasonable in price. ** Most of our moulds exported to Russia, Israel, India, Egypt, Arab, Brazil, Mexico, Philippines and other Europe & America countries.
FAQ
Chenhang Mould Operating Steps
1.Unscrew the bolt to take down the Connection Block.
2.The cooling channel connected by Diffluent Block.
Car Front Bumper injection plastic mould mold for the manufacture of kayak
Attention pls:
Pease offer the following information when you send us the mould inquiry
a) product drawing or the sample photo with sizes.
b) mould steel you want to use.
c) standard mould base or not.
d) runner system you want(cold or hot)
Contact Us
Our location on map
The time take from other city
1.From Ningbo by train 1 hour.
2.From Yiwu by bus 3 hours.
3.From Shanghai by train 4 hours.
4.From Guangzhou by air 2 hours.
Please feel free to contact with us for any inquiry of plastic mould & products . Thank you !