Customer send us the product drawing directly or we draw the product
according to the sample,then we send customer the product drawing to confirm
2
Mould Design
We'll start to design mould after the product drawing confirmed,then
send customer the mould drawing to confirm
3
Mould Making
The mould start to make after the mould drawing confirmed,the process
include prepare steel,rough cut,finish machining,assembly etc
4
Mould Test
we'll test the mould after mould assembly,then we'll send customer samples
and video of mould test to confirm
5
Final Process
The mould start to polish if the sample is ok,and make grain,nitridation or
chroming if customer required
6
Mould Test
We'll test the mould again after polishing,then send customer the final
sample and video of mould test to confirm
7
Mould Packing
The mould stard to pack with wooden case after the final sample confirmed,
then the mould will be sent to port and waiting for shipping
Company Information
Taizhou Huangyan Chenhang Mould Factory is a professional company engaged in mould design, manufacturing & producing, We are specialized in plastic injection mould,such as commodity mould,electronic products mould,auto & motorcycle accessories mould etc.
Most of our moulds exported to Japan,Germany,Holland,Spain,Russia,Israel,Egypt,Arab,Brazil,Mexico,Philippines,india and other Europe & America countries.welcome you to visit our website: to learn more information.
Packaging & Shipping
FAQ
Chenhang Mould Operating Steps
1.Unscrew the bolt to take down the Connection Block.
2.The cooling channel connected by Diffluent Block.
Our Services
Chenhang Mould Quality Control
1.Mould Material Q/C
a) mould steel checking (hardness,flaw detection)
b) mould spare parts checking (hardness,size)
2.Mould Making Process Q/C
a) design checking ( part design,mould desig,mould enginering drawing)
b) mould size checking (according to drawing)
c) mould testing (check mould working,sample)
Attention pls:
Pease offer the following information when you send us the mould inquiry
a) product drawing or the sample photo with sizes.
b) mould steel you want to use.
c) standard mould base or not.
d) runner system you want(cold or hot)
Contact Us
Our location on map
The time cost from other city
1.From Ningbo by train 1 hour.
2.From Yiwu by bus 3 hours.
3.From Shanghai by train 4 hours.
4.From Guangzhou by air 2 hours.
Please feel free to contact with us if you have any inquiry for Plastic Injection mould . Thank you !