Durable,strong,and suitable for harshest environmental conditions
High standard
UL6 AND FM LISTED.
low cost
Lower life-cycle costs
Professional team
including 300 high/middle professional engineers and technicians.
Company Information
ABOUT
Weifang East Pipe Industry established in 1979 in world kite capital – Weifang, is a professional enterprise integrating steel pipe manufacuring, technology research, and import and export trade. It is one of the best manufacturers of expressway barrier in China, the largest manufacturer of steel pipe in Shandong as well as the best exporter of steel pipes and various steel products.
READ MORE →
1.Online Testing Facilities
2. Laboratory Equipment
3. UL FM listed
Related Products
Packaging & Shipping
PACKAGE:
Standard export carton packing.
DELIVERY TIME:
35-40 days after confirming order,detail delivery date should be decided according to production season and order quantity.
FAQ
FAQs
1. How about the pipes thickness?
Normally, the thickness will be SCH10/SCH40 series, Light/Med series etc, if the quantity is big, we can produce steel pipes according customers’ request.
2. What are the standards of the fire fighting pipes which your factory could produce?
We can produce steel pipes according ASTM A795 / A135 / A53 with UL/FM Approvals, Besides, we also can produce BS1387/DIN2440 steel pipes without UL/FM Approvals, but we can control the quality according to the exact demands.
3. What’s the pipe length which you con provide?
Normally the pipe length will be 19FT(5.8 meters) suitable for 20FT containers shipment, other length such as 6.0 meters and 20FT and 21FT are all workable for us, black pipes max length will be 24FT(7.315 meters), Gal and Powder coated pipes max length will be 6.5 meters.
4. How about your pipe quality control?
First of all, we have established long term firm cooperation relationship with the steel mills, the raw steel coils quality can be assured.
Second, we have comprehensive lab to make test on the process of pipes production at any time.
Third, we will apply the eddy current test when producing pipes.
Fourth, we will apply water pressure test for each pipe.
Finally, we will have the final inspection after the production finished before shipment.
5. How about the package of the finished pipes?
The package style will be international standard, we will use plastic sheet to cover the pipes bundle, and then use galvanized steel strip to pack 2+2+2 to assure the pipes bundle is firm and safe.