Home > Products > Power Plant Accessories > Steam pipe purge target board
Steam pipe purge target board
- 100000 Piece / Pieces per Month
- tianjin
- T/T
- 10 days
You May Like
-
Steel Pipe Large Diameter For Water Gas And Oil Submerged Arc Welded
-
Polyethylene Layer Steel Pipe For Industrial Materials Liquid Transport Oil Painting
-
For Heat Engineering Oil Painting Anti Corrosive Steel Tube
-
For Steam And Boiler Manufacturing Polyethylene Layer Steel Pipe Thick Wall
-
Ssaw/lsaw Steel Pipe Thick Wall For Water Gas And Oil Anticorrosion
-
For Water Anti Corrosive Steel Tube Large Diameter
Product Details
Brand Name | zexu | Place of Origin | China | |
Model Number | Processing according to the figure | Material | Other, AL |
Product Description
After installation of the piping system, air or steam may be used for cleaning according to the working conditions of the working medium and the degree of dirt on the inner surface of the piping. The general requirements for pipe purging are:
Equipment and pipes that are not allowed to be purged should be isolated from the purging system.
Before the pipeline is purged, orifice plates, flanged control valves, main valves, throttles, safety valves, meters, etc. should not be installed. For the above valves and meters connected by welding, they should be bypassed or sealed off. Protection measures. The purging sequence should be performed in the order of the main pipe, branch pipe, and drainage pipe, and the blown-out dirt should not enter the pipe that has been qualified for purging.
The dirt discharged by purge shall not pollute the environment, and random discharge is strictly prohibited.
A restricted area should be set before purging.
No other operations affecting cleaning shall be performed after the pipeline has been purged.
1. After the strength test of the pipeline system, before the air tightness test, purge and clean it in sections.
2. The cleaning method should be determined according to the requirements of the pipeline, the working medium and the degree of stolen goods on the inner surface of the pipeline. Liquid or gas pipelines with a nominal diameter of 600 mm or more should be manually cleaned. Liquid pipelines with a nominal diameter of less than 600 mm should be used. Air purging should be adopted for gas pipelines with water cleaning and a nominal diameter of less than 600mm. Steam piping should be used for steam pipelines, and non-thermal pipelines should not be steamed. The purging of the normal gas is generally performed in sequence in accordance with the main pipe, branch pipe, and drainage pipe.
3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system.
4. Blowing equipment and pipes are not allowed to be separated from the blowing system.
5. After the pipeline is purged and qualified, in addition to the prescribed inspection and restoration work, no other work affecting the cleaning of the pipeline shall be performed, and the Pipeline System Purge Record shall be completed.
Contact Us
- Hebei Zexu Pipeline Manufacturing Co., Ltd.
- Contact nameZhao Lijun Chat Now
- Phone86-0317-5128772
- AddressYanshan, Cangzhou, Hebei
Product Categories
Target plate | Socket Weld | Reducer | Flange |
Casing Cap | Seamless Pipe | Power Plant Accessories | Pipeline Purge Device |
Tee | Elbow | pipe fitting | Cross |
Head |
New Products
-
09MNNID Seamless High Cleanliness Steel Pipe Quality Stability High Standard
-
For Petroleum, Chemical, Power 10CrMo910 Alloy Steel Pipe Seamless Steel Tube
-
10CrMo910 Alloy Steel Pipe Seamless Steel Tube China Professional Manufacturers Supply
-
09MNNID Seamless Steel Pipe Quality Stability High Standard High Cleanliness
-
Pipe steam purge aluminum target board
-
High temperature alloy B564 N08800 forged flange, nickel-based alloy flange
-
Target Plate Made Of Aluminum Plate 450*50*8
-
Titanium Sputtering Target 630*30*5
-
450*50*8 Sputtering Target
-
Mirror Target Plate 630*30*5
-
Aluminum Alloy Target Plate 630*30*5
-
Titanium Sputtering Target 1020*50*6
Popular Searches
- drill machine
- board game
- Game Toy
- Magnetic Dart Board
- Dart Board Target
- Hole Punching Machine
- Hole Drilling Machine
- surveying instrument
- surveying equipment
- surveying
- optical prism
- edm
- prism target
- prism system
- Laser Plummet
- Dart Board
- leica
- single holder
- Gps Gnss Receiver Rtk
- suspended
- single prism
Recommended Products
- 90 ° long radius stainless steel seamless elbow
- UPVC Elbow 90°, JIS K6743 ,anchor
- Carbon Steel 3000 PSI Pipe Fittings
- HDPE BUTT FUSION EQUAL DIAMETER 45-DEGREE ELBOW
- Furniture Feet Fencing Tube Chair Plastic Insert End Cap Stainless Steel Pipe End Cap
- HDPE BUTT FUSION EQUAL DIAMETER 90-DEGREE ELBOW
- HDPE BUTT FUSION REDUCING TEE
- HDPE BUTT FUSION EQUAL TEE
- HDPE BUTT FUSION REDUCER COUPLING
- PVC Pipe Covers Round Female Threaded Plastic Dust Cap Copper Aluminum Pipe End Cap
- PVC Threaded 4 Inch 3 Inch 8 Inch Female End Cap Plastic Pipe Cap Pvc
- MOCAP BSP NPT Metric Pipe Corrosion protection Plug
Find Similar Products By Category
- Construction & Decoration > Pipe Fittings > Tee

Product Tags:
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Zhao Lijun
Hi there! Welcome to my shop. Let me know if you have any questions.
Your message has exceeded the limit.

- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile