Home > Products > Gold CIL Equipment > Desorption electrowinning set for gold cyanidation process CIL Plant in 2016
Desorption electrowinning set for gold cyanidation process CIL Plant in 2016
- 30 Set / Sets per Month
- Qingdao or other ports
- T/T
You May Like
-
Desorption Electrolytic Equipment Complex for gold extraction
-
10tpd small gold processing line for sale
-
Gold tailings desorption electrowinning in gold CIL and heap leaching
-
Gold pulp CIL/CIP processing plant, complete spiral gold ore processing machine
-
Full set of gold panning plant, gold cyanide leaching CIL plant
-
Mobile trommel washing gold plant for placer gold processing
Product Details
Place of Origin | Shandong, China | Brand Name | JINPENG | |
Model Number | JPG | Condition | New | |
After-sales Service Provided | Engineers available to service machinery overseas |
Product Description
Yantai Jinpeng Mining Machinery CO., LTD
Professional mineral processing design, equipment production,installation and conmissioning institue.
Tel: 0086-535-3410108
Desorption Electrolytic Equipment Complex for gold extraction
This system mainly consists of desorption part, electrolytic part, instrumental control part,pipeline,and valves. These parts are integrated with each other and form an integral system.
Main equipment of this system includes desorption column, filter, electrolytic bath, circulating pump, electric heater, heat exchanger, stripping liquid storage tank, carbon storage tank, electric control
cabinet, and rectification cabinet, etc.
Description | Model | Q’ty |
Desorption column | JDJ0728 | 1 |
Filter | YM400×550 | 1 |
Electrolyte tank | DJC1615 | 1 |
Electric heater | JDDR-24 | 2 |
Stripping liquid storage tank | BJW1000 | 1 |
Heat exchanger | JDR0413 | 1 |
Carbon storage tank | CTC1000 | 1 |
Liquid storage tank | CYC1515 | 1 |
Principle of desorption
After the gold in cyanide solution is adsorbed by activated carbon, a reversible equilibrium state is established in the cyaniding system between the gold on the surface of gold-loaded carbon and the gold in cyanide solution. The gold-loaded carbon is also in the similar equilibrium state when it is desorbed. When adding CN- or OH- to the desorption system, as these anions are more easily adsorbed by the activated carbon, Au(CN-)2 already adsorbed will be recovered, and the reversible equilibrium of gold adsorption is interrupted and develops adversely against gold adsorption. This is gold desorption. The process of gold desorption is shown as follows:
We can presume that desorption of gold from gold-loaded carbon is essentially trying to destroy the equilibrium of activated carbon adsorption, and causing the process to develop adversely against gold adsorption. Therefore, increasing the cyanide density, increasing alkalinity, raising the temperature, boosting the pressure or adding organic solvent will accelerate desorption of gold from the activated carbon.
Principle of electrolysis
The pregnant solution obtained through desorption of gold-loaded carbon contains gold undoubtedly. The gold contained in pregnant solution can be recovered by electrolytic method. Because no new substance is added into the solution in the process of electrolysis, pure gold sediments can be obtained, which facilitates the further treatment. Therefore, electrolytic method is adopted by most of the gold mines.
Gold exists in the desorbed pregnant solution in the form of Au (CN-) 2. Precipitation of gold, silver and little copper is done by the cathode in the electrolysis process, and so it is with hydrogen due to water deoxidization. Oxygen is separated out by the anode, resulting in ionic oxidation, where carbon dioxide and nitrogen are separated.
Here are the reactions:
Cathode reactions:
Anode reactions:
Reactions of bulk solution:
Other reactions also occur in the electrolysis process. However, these three kinds of reactions mentioned above are principal.
Tests and research show that, under normal electrolytic conditions, main control procedures of gold electrolysis depends on the velocity of Au(CN)2¯ diffusing to cathode surface, and the gold deposition velocity is only subject to the control of mass transfer process. The electrolytic efficiency can be represented by the following formula:
Log(CO/C1)=KmtS/2.3F
Of which: Km=P/δ-----mass transfer coefficient; P----diffusion coefficient of discharging particle (Au(CN)2¯); δ----thickness of diffusion layer; CO----primary gold concentration; Ct----gold concentration after electrolysis; t----time of electrolysis; S----surface area of cathode
Used in the following gold CIP flowchart.
Used onsite
Welcome to visit our lab, design institute and factory!
Contact Us
- Yantai Jinpeng Mining Machinery Co., Ltd.
- Contact nameMatthew Zhu Chat Now
- Phone86-535-3975290
- AddressNo.11 FUZHOU ROAD, DEVELOPMENT ZONE. YANTAI CITY, SHANDONG PROVINCE, CHINA, Yantai, Shandong
Product Categories
New Products
-
Gravity separation method gold ore processing plant, mobile gold ore dressing plant
-
Sudan gold CIP production line, gold trommel washing plant
-
Alluvial gold removable beneficiation processing plant in Kazakhstan
-
Complete set of gold processing plant with 99.99% recovery gold in Laos
-
20tpd gold processing equipment and gold ore dressing plant in Myanmar
-
High capacity Tin ore processing plant in Bolivia
-
High efficiency and low cost gold processing plant
-
gole mine gold processing equipment gold equipment gold mining machine high quality Activated Carbon Regeneration Kiln for CIL
-
Desorption and Electrowinning machines for Gold after leaching process in CIL plant
-
Loaded Carbon Desorption and Electrowinning machines for sale
-
Leaching Tank used for Gold absorbtion
-
Best Agitation mixer Leaching Tank for gold
Popular Searches
- garden machine
- marine equipment
- construction equipment
- instructional package
- kawasaki
- mini excavator
- excavator parts
- hydraulic excavator
- direct-drive
- hydraulic breaker
- hydraulic hammer
- hydraulic rock breaker
- excavator attachment
- rock breaker
- Transmission Part
- orange peel
- bucket teeth
- undercarriage parts
- track roller
- excavator bucket
- shield cutter
- roller cutter
- Excavator Part
- Excavator Spare Part
- Excavator Machine
- quick coupler
- free shipping
- marine machine
- photo
- Construction Shovels
Recommended Products
- YZH’S strength static boom system
- Excavator PC400-7 swing circle assy 208-25-61100
- PC60-7 TRAVEL MOTOR 201-60-73601
- sell PC1250-7 SWING MACHINERY 21N-26-00070 X21-0860310
- YZH’S strength fixed boom system
- Heavy-Duty Mobile Hammer Crusher: Portable Rock Crushing Solution
- Heavy-Duty Mobile Crusher: Portable Rock Crushing Solution
- High-Power Mobile Diesel Hammer Stone Crusher for Mining Sites
- A gravel crusher used for crushing and screening various types of materials
- YZH’S high strength fixed rockboom
- Pneumatic track drilling machine XQZ-32Track drilling machine
- Pneumatic anchor drilling rig Anchor cable drilling rig
Find Similar Products By Category
- Manufacturing & Processing Machinery > Engineering & Construction Machinery > Excavator
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Matthew Zhu
Hi there! Welcome to my shop. Let me know if you have any questions.
Your message has exceeded the limit.

- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile