Home > Products > New Products > Double Tank Manual Batch Mixing skid
Double Tank Manual Batch Mixing skid
- 30 Set / Sets per Month
- Tianjin Shanghai
- T/T
You May Like
Product Details
Place of Origin | China | Model Number | BCS-300-100 | |
Type | Other, Mixing skid | Machine Type | Drilling Equipment | |
Certification | API | Material | High Manganese Steel | |
Processing Type | Casting | Use | Well Drilling |
standard export package
Product Description
Specifications
1.API standard2.High energy mixing system
3.Low cost and economical
4.Easy to transport and hoist
BCS-300-100 Manual Batch Mixing skid
Product Explanation:BCS-300-100 Manual Batch Mixing skid, it is regarded as the economic and substantial edition which is based on continuous batch mixing system without ACM system, and applied to slurry batch mixing work during cement work. Working principle: to realize slurries circulating mixing by recirculating centrifugal pump, at the same time to meet the destination of cementing and dry additive through flexible ejector on the top of tank.
The batch mixing tank can be installed two structures: single tank 120BBL or 2X50BBLdouble tank
Product Features
1.Without ACM system and high energy mixing system, low cost and economical.
2.Adopt international pop single tank or 2x50BBL, and install large power blender in each tank
3.Special design of hoist collision-proof brace, easy to transport and hoist
4.Choose the electricity driver system, it can meet the demand of ZONE-II and suit to offshore flat work
Configuration | ||
manual batch mixing | single tank | double tank |
dimension (length x width x height) | 6850 x 2500 x 3150 | 7200 x 2500 x 3150 |
G.W | About 13t | About 11t |
batch mixing volume | 120BBL (single tank) | 2x50BBL (double tank) |
slurry density range | 1.3-2.7 g/cm³ | 1.3-2.7 g/cm³ |
Working temp. | -25 °C ~50 °C | -25 °C ~50 °C |
Configuration | ||
engine | caterpillar C7 300HP@2200RPM | caterpillar C7 300HP@2200RPM |
gear box | Funk 59000series | Funk 59000series |
hydraulic system | Eaton heavy close hydraulic system | Eaton heavy close hydraulic system |
recirculation centrifugal pump I | Mission 5X6X11 | Mission 5X6X11 |
Recirculation centrifugal pump II | Mission 5X6X11 | Mission 5X6X11 |
eject system | Simple jet system+ hopper | Simple jet system+hopper |
Dry cement valve | Manually cement valve | Manually cement valve |
batch mixing tank | single tub blender | Double tub+blender |
options | ||
Mixing system | Choose high energy mixing system | |
drive system | 1. Motor drive the centrifugal pump and blender via hydraulic system, and it can meet the demand of Zone-II explosion-proof and attest | |
2. Motor drive the centrifugal pump and blender directly, and it can meet the demand of Zone-II explosion-proof and attest |
Company Profile

As a professional supplier of OCTG, drilling equipment and workover service, Sinotai Petroleum Equipment Co., Ltd. lies in the production base of petroleum equipment and China's second largest oil field --Shengi Oilfield. Our company is a high-tech enterprise in Dongying City with business scope covering the sale, trading, post-sale service and technological development of a wide variety of petroleum equipment. Besides OCTG, we provide our customers with other drilling and oil recovery equipment like fishing tools, cementing tools, workover rigs, pumping units and OCTG accessories. The striving target of our company is "Prestige first, Quality supreme; The shortest delivery time, The lowest price, The best quality". Customers' needs are our first priority and customer satisfaction is the bottom line by which we measure our success.
Contact Us
- Sinotai Petroleum Equipment Co., Ltd.
- Contact nameHerish Kuo Chat Now
- Phone86-546-8300512
- AddressNo. 107, Bldg. 45, Gaoerfu, Wanda, Dongcheng
Product Categories
New Products
-
Double Engine and Pump Cementing Skid
-
PCS-521B Auto Density Control Twin-Pump Cementing Skid
-
PCS-521B Twin-Pump Cementing Skid
-
High efficiency Twin-Pump Cementing Skid
-
Twin-Pump Cementing Skid( skid or trailer mounted)
-
Twin-Pump Cementing Skid( skid or trailer mounted) for drilling operations
-
PCS-522A Zone-II Twin-Pump Cementing Skid
-
Zone-II Twin-Pump Cementing Skid
-
Zone-II Twin-Pump Cementing Skid(TPD600 or TPH400 plunger pump)
-
PCS-522A Twin-Pump Cementing Skid(TPD600 or TPH400 plunger pump)
-
Twin-Pump Cementing Skid for operating conditions in Zone-ll
-
PCS-611A Single Pump Cementing Skid
Popular Searches
- forging hammer
- Dth Hammer
- Drilling Hammer
- Hole Hammer
- pick
- hollow anchor bar
- wearing
- Cone Crusher Accessory
- Wearing Part
- Tungsten Carbide Button
- Chisels
- hydraulic breaker chisel
- drill rod
- Rock Breaker Chisel
- Hydraulic Hammer Breaker Chisel
- Spare Parts Chisel
- Spare Parts Rock Chisel
- Point Chisel
- Breaker Parts Chisel
- Hydraulic Breaker Rock Chisel
- Mining Machine Part
- Rock Drilling Tool
- Water Well Drilling Tool
- Rock Drill Tool
- test liner
- teeth
- chisel
- Breaker Hammer
- metallographic
- Geography
Find Similar Products By Category
- Manufacturing & Processing Machinery > Mining Machinery > Mining Machinery Parts
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Herish Kuo
Welcome to my shop, I'm glad to serve you. Please feel free to send me any questions you may have.
Your message has exceeded the limit.
- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile