Home > Products > Frame systerm > Wood h beam for construction support
Wood h beam for construction support
- 100000 Meter / Meters per Month
- Ningbo or Shanghai
- T/T L/C D/P D/A
You May Like
Product Details
Place of Origin | Zhejiang, China | Brand Name | LUOWEN | |
Model Number | LW-TB102 |
Product Description
Product introduction
Luowen timer beam is multilayer plywood of web and with plastic head,is of light weight, high tenacity, and excellent in waterproof, acid-proof, alkali-proof, straightness.
Product features
1,Light Weight: the density of H20 Timber Beam is only 4.8-5.0kg per meter, it is easy to deliver,dismantle and install.
2,High Tenacity: The H20 Timber Beam is not easy to break off because of fiber.
3,Good Proofing: The H20 Timber Beam is good at waterproofing, acid proofing, alkali proofing, moth proofing.
4,Environment Friendly: The Timber Beam belongs to renewable resources, could be used many time. and without poison, no damage to health.
5,Good Straightness: The H20 Timber Beam in not easy to deform.
Detailed parameters
Specifications | |
Item | LW-TB101/LW-TB102/LW-TB103/LW-TB301/LW-TB302/LW-TB303
|
Wing Material | Imported spruce solid wood, finger-jointed and glueing according to DIN 68140-1 |
Web Material | Multilayer poplar plywood |
Head Protection | Without head protection/Plastic head protection/Injection molding plastic head |
Glueing | (PRF) Finger-jointed between wings and web pursuant to approval notice Z-9.1-146 |
Moisture Content | less than 12% at the time of delivery |
Surface Protection | The complete beam is waterproofed using a water-repellent color glaze |
Color | Yellow or as customer's request |
Wing Size | 80x40mm |
Web Size | 30mm thickness |
Weight | about 5kg/m |
Standard lengths | 2.45 / 2.90 / 3.30 / 3.90 / 4.90 / 5.90 m (Max.length:6.00m) |
Mechanical Specification | Modulus of elasticity : E 11,000 N/mm2 |
Shear modulus | G 600 N/mm2 |
Packing | Pallet or in bulk |
Application | Level formwork system, Vertical formwork system, Adjustable formwork system, Curve formwork system, Irregular formwork, etc. |
2.Well-trained & experienced staffs are to answer all your inquiries professional in English of course.
3..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
4.Excellent quality and Competitive price,OEM is highly welcomed. We have strong R&D team here to help.
5.Less than one container loading is accepted.
6.On time delivery, in general 25-40 days.
7.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.
Certificate
“Better Formwork Better Construction!”, founded in 1998 in Ningbo City of China, Ningbo Luowen Group Co., Ltd. is a profession group company in designing,researching and developing, manufacturing,selling and installing construction formwork. Of 2012, the annual sales value of Luowen Group had achieved US Dollars 25 million, and more than 70 percent was exported.
The founder of Luowen group is Mario, who was the construction engineer of Zhejiang Donghai Construction Group Co., Ltd. before. Mario had worked as a worker in Donghai Construction Group from 1980 to 1998, no matter day and night or being exposed to wind and rain, Mario took all mind and body to work and study hardly, so when Mario was in Donghai Construction Group, he had been the most excellent construction engineer even as a normal worker at first.
At the 1998, Mario gave up the comfortable job in Donghai Construction Group and founded the Ningbo Luowen Formwork Co., Ltd. at the first, Luowen Formwork Company had only 3000 square meters factory and 25 workers, Mario was not only the founder, but also the designer,technicist,production supervisor and sales manager, and this was just the rudiment of Luowen Group.
At the 2005, Ningbo Luowen Formwork Co., Ltd. had built its new factory which is of 42 000 square meters area, there are more than 400 employees including professional research and development team,production team,market team and installing team.
Also at the 2005, Ningbo Luowen Formwork Co., Ltd. decided to develop the international market of formwork, and establish the international department immediately, the first sales team included 3 sales then.
From 2005 to 2011, Ningbo Luowen Formwork Co., Ltd. had purchased most stocks of 5 formwork factory in China, and established Ningbo Luowen Group Co., Ltd. the head office is in the South Business District where is the biggest and most modern district in Ningbo city.
Ningbo Luowen Group Co., Ltd. insists the concept of “Market is the most exacting guiding, Customer is the most excellent teacher, quality is the most solid base, Credit is the most effective ensures!” We hope and try best to establish friendly and longtime cooperation with more and more customers all over the word.
Contact Us
- Ningbo Luowen Import And Export Co., Ltd.
- Contact nameMario Luo Chat Now
- Phone86-574-55224896
- Addressroom 1906 jiancheng building, no.99 taihui road. south business district, ningbo china. , Ningbo, Zhejiang
Product Categories
Businessmen recommend | Formwork accessories | Frame systerm | New Products |
plastic formwork | plywood formwork | Recommended Merchant | Scaffolding |
Steel prop | Timber beam |
New Products
-
Good price easy used steel formwork in building
-
High Quality Strong and reusable steel formwork panels
-
Wall 63 Steel modular Formwork System
-
steel framed plywood formwork for Construction
-
Factory price steel column formwork for concrete made in China
-
120 steel framed structure for building
-
reusable Steel Frame Formwork for concrete
-
steel formwork tower used for multi-storey construction
-
steel column formwork for concrete made in China
-
China factory wholesale steel formwork for concrete wall
-
Hot-Sale steel formwork for column made in China
-
China factory wholesale steel formwork for concrete walls
-
newly designed steel formwork for concrete made in China
-
formwork steel panels for concrete construction
-
Factory Price Hot Sale steel formwork panel
-
High Quality High Stiffness steel formwork for construction
-
Wholesale all types of steel panel clamp formwork for sale
-
2015 lastest construction building formwork for Construction
Popular Searches
- veneer
- teak
- oak
- Engineered Wood Veneer
- log
- Logs
- burma teak
- sawn timber
- timber wood
- wooden board
- Wood Timber
- Paulownia Timber
- Paulownia Board Timber
- Black Walnut
- door veneer
- solid wooden
- Wood Veneer
- Flower Wood
- furniture wood
- bed board
- face veneer
- keruing veneer
- rotary cut veneer
- poplar veneer
- gurjan veneer
- plb
- natural veneer
- reconstituted wood
- Plb Veneer
- Okoume Veneer
Recommended Products
- bamboo stick
- Standard size incense sticks natural color Agarbatti 1.3mm round small bamboo stick incense made in China
- Factory wholesale best brand raw material bamboo incense stick used for making incense
- Hot sale high quality bamboo sticks for incense stick with cheap price
- Design eco-friendly bbq wholesale color raw bamboo natural incense sticks for sale
- bamboo stick cutting machine
- bamboo stick Qi head machine
- bamboo stick cutting machine
- bamboo stick production agarbatti
- bamboo stick production agarbatti
- Standard size incense sticks natural color Agarbatti 1.3mm round small bamboo stick incense made in China
- bamboo sticks incense stick raw material
Find Similar Products By Category
- Construction & Decoration > Timber & Plywood > Solid Wood Board
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Mario Luo
Welcome to my shop, I'm glad to serve you. Please feel free to send me any questions you may have.
Your message has exceeded the limit.
- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile