bowling equipment pinsetter

Browse 5 global buying requests and sourcing opportunities.
  • Need 3 pieces of bowling back end gear replacement kits with 50Hz specification for equipment maintenance. Require safest and fastest shipping method (DHL preferred). Confirming availability for shipment to Baku, Azerbaijan. Agreed total cost including shipping needs final confirmation before proceeding.

    Azerbaijan Azerbaijan
    Posted at: 2025-09-25 23:10:03
    ******
  • I need a fully automatic glass cutting machine for processing glass plates, bowls, and trays. The equipment must handle glass thickness ranging from 2mm to 6mm. Critical requirement: The cutting process should leave no sharp edges on glass products. Target delivery within 3-5 months. No specific brand preference.

    Egypt Egypt
    Posted at: 2025-09-07 20:00:03
    I
    ******
  • Looking for clarity bowl equipment suitable for water treatment applications. Need products that effectively separate suspended solids in treatment processes. Please provide specifications and material details.

    Global Global
    Posted at: 2025-09-06 03:20:02
    G
    ******
  • We are looking to purchase bowling equipment parts for our operations. Specific items required include:  
    1. Motors  
    2. Sensors  
    3. Ball accelerators  

    Please provide:  
    - Technical specifications for each component  
    - Minimum Order Quantity (MOQ)  
    - FOB pricing  
    - Production lead time  
    - Confirmation of delivery capability to Cuba  

    Suppliers with OEM/ODM experience in bowling machinery preferred. Kindly send product catalogs and compliance certifications.

    Cuba Cuba
    Posted at: 2025-08-20 05:50:04
    R
    ******
  •  Please select a two-section fan cooling tower. The power of one section is 1276 kW. Water temperature at the entrance to the cooling tower is 30 C Water temperature at the outlet of the cooling tower is 25 C Outdoor air temperature according to wet thermometer 22 C The presence of a heated pan to prevent freezing. The design of the cooling tower must ensure operation in the mode: one section is working, the other is reserve and vice versa. The design of the cooling tower must ensure the ability of one section to operate completely with the shut-off valves drained off and drained from the reserve section SOW pipelines. The pool of sections must be separated by a partition so that one of the sections can be completely drained. Return water parameters: - pH - 8.64; - total hardness - 5.52 mEq/l; - concentration of petroleum products -0.39 mg/dm3; - chloride ion concentration - 22.0 mg/dm3; - concentration of suspended substances - 12.7 mg/dm3; The service life of all elements of the cooling tower, with the exception of the load-bearing frame, pan (bowl), pipelines, fan and enclosing structures, is at least 10 years. The service life of the load-bearing frame, tray (bowl), pipelines, fan and enclosing structures is at least 15 years. The equipment must be equipped with drives based on brushless (non-contact) or asynchronous motors. 

    Belarus Belarus
    Posted at: 2024-07-15 20:01:03
    ******