-
Inquiry About PC-4 Environment sensor for PV Power Plant-Weather Station, wind speed, solar radiation, atmospheric pressure, rainfall
Thailand
Posted at: 2024-11-06 17:46:14******Email:****** -
I looking forward to the voltage and current transducer for the electrical power plant.
Vietnam
Posted at: 2024-09-16 16:39:21******Email:****** -
power plant solar system 50 Mg watt for Iraq
Poland
Posted at: 2024-08-19 15:39:35******Email:****** -
we are looking for boiler, turbine and generator for power plant project
India
Posted at: 2024-07-22 09:50:48******Email:****** -
Inquiry About Central current collector Center slip ring for power plant or stacker and reclaimer or Rotary kiln etc
India
Posted at: 2024-06-19 12:31:37V******Email:****** -
Inquiry About Central current collector Center slip ring for power plant or stacker and reclaimer or Rotary kiln etc
India
Posted at: 2024-06-19 12:30:58******Email:****** -
I am contacting you to request your price offer for 12 grinders with sieving with the following characteristics: CONCERNS OF THE TESTS Preparation of fertilizer and phosphate samples: the preparation of a sample for the laboratory is a series of grinding, sieving and homogenization operations. REFERENCE STANDARDS NF EN 1482 DESCRIPTION : Grinder allowing simultaneous grinding-sieving Adjustable grinding speed ? Suitable for grinding fertilizers and phosphate ? Grinder with chemically and thermally inert material ? Supplied with 12 tooth rotor ? Supplied with collection containers ? Suitable for aggressive environments (e.g. fertilizer production plant) METROLOGICAL FEATURES ? Fine grinding up to approximately 40 urns ? Sieving rings (0.5mm; 0.75; Imm and 1.5mm) ? Rotation speed: 6000 to 18000 rpm ? Power supply: 220V / 501-lz ACCESSORIES : ? Replacement seals ? Sieving rings ? Maintenance kit DOCUMENTATION TO BE PROVIDED: Documentation in French (Use, Care, maintenance, etc.) Best regards
Morocco
Posted at: 2024-05-31 22:19:22******Email:****** -
Inquiry About CFB Boilers for 2 x 150mW Power Plant
Philippines
Posted at: 2024-05-15 00:55:09******Email:****** -
quote for the supply and delivery of the following item/s: 2,585 pce Filter Bag Model: CS31 Bag Size: 130mm dia X 8065mm length, 580g/m2 Application: Filter Baghouse for Coal Fired Power Plant Material: PPS/PPS 584 CS31 TAN 98645 PTFE Coated, Oil
Philippines
Posted at: 2024-04-26 08:13:16T******Email:****** -
LVDT 0-250MM TSI RANGE : 0-250MM QTY : 4 EA
India
Posted at: 2024-03-12 15:28:10******Email:****** -
How much would a twin Expander with Generator for Power Generation from a 3 TPH F&A 100 Deg C Boiler Steam. What is Out put in KWH.
India
Posted at: 2024-03-12 13:58:55S******Email:****** -
Inquiry About Rectifier SCR Firing Card for 5000A Power Plant
South Korea
Posted at: 2024-03-12 10:15:27******Email:****** -
Price for 500kw screw steam expander
United States
Posted at: 2024-01-29 21:00:03******Email:****** -
Please send me the updated price and MOQ?
Please send me detail product specification, thank you!I would like to know the 500kW biomass gasification plant information1 set price, set compositionSouth Korea
Posted at: 2024-01-11 14:40:03******Email:****** -
Dear Sir/Madam, My name is Sakkas Dimitris. We are looking for a complete production line for wood pellets from pine, fir and elm trees. The production line capacity should be around 3,5 tones/hour and the line should be up and running for 8000h/year. The production line should consist of: -Wood chipper 12 t/h -Wood chips cleaner 12t/h (separation from dust, mud etc) -Furnace (15MW thermal power) using solid state fuels ie. wood chips, charcoal etc. -Dryer with chip conveyor (input) and all the components required for air transportation of dried chipps to pellet mills (output) -Wood chip mill 3,5t/h -Pellet mills (ring die) for 3,5t/h (including peripherals, compression 25mm) -Pellet Cooling system -2x Packing system for 15 (plastic bags) and 40kg (cotton bags) This production plant should include all electrical connections, automation systems and all the peripherals like cyclones, filters, conveyors, furnace fuel feed supply system and ash removal system. We are looking forward to an initial offer from your side. The offer should include the transportation of the plant to our facilities in Karditsa, Greece and the proper installation. Thank you very much in advance for your cooperation.
Russian Federation
Posted at: 2023-12-27 23:22:45******Email:****** -
Dear Concern, Greetings from PILLER Power System. We are interested in participating in an international tender invited by the Bangladesh Power Development Board (BPDB) for the following items and quantities: (1) First Stage Filter (Coalescer) – Quantity: 4,320 Pcs (2) Second Stage Filter (Pre-Filter) - Quantity: 4,320 Pcs (3) Third Stage Filter (Fine Filter / Mini Pleat) – Quantity: 2,160 Pcs. The filters will be used in Sylhet 225MW CCPP Power Plant. If you are interested we may proceed with the discussion. Waiting to hear from you.
Global
Posted at: 2023-12-17 22:00:03******Email:****** -
I would like to purchase your products. Please contact me
Global
Posted at: 2023-12-10 21:59:28******Email:****** -
Good morning I would like to inquiry about hydrogen generator.
United States
Posted at: 2023-12-08 17:29:38******Email:****** -
Please send me a catalogue & prices. We need this model DLS-250 DLS ZLSH Vertical Completely Fully Automatic Filtration Drainage Sewage Cleaning Water Filter for technical cooling water supply treatment for Hydropower hydroelecric power Plant HPP HEPP SHPP SHEPP Kindly contact Faheem Javed +923006754767 whatsapp
China
Posted at: 2023-11-30 17:33:50******Email:******